When you call, we ask about the space, how you want to use it, and anything you already know is wrong with it (water, cracks, a drop ceiling someone installed decades ago). We get a site visit on the calendar within a few business days. On site, we check ceiling height, look at the foundation walls for moisture or cracking, check the electrical panel, and measure. You'll have a direct line to the person running your job after this. That's who you call if something changes, not a general office number.
Duration: 3 to 5 business days from your call to the site visit.
We put together a written quote based on what we saw at the visit: scope, materials, a rough timeline, and what's excluded. If you want to see what's typically included and what it costs before you get a number specific to your house, the service page covers that in more detail.
Duration: quote delivered within 3 to 5 business days of the site visit.
Once you approve the quote, we go through selections together: flooring, doors, trim, lighting, bathroom fixtures if a bath is in scope. Cabinetry and certain flooring carry real lead times, so we order early rather than waiting until demolition is finished.
Duration: 1 to 3 weeks, depending on what's on back order.
We file for the building permit with the Belmont Building Department. Belmont's own process allows up to 30 days to review a permit application (Belmont Building Division), though most residential basement jobs move faster once the paperwork is complete. If the scope includes an egress window or a bathroom, electrical and plumbing permits are filed alongside the building permit, not added on after work has already started.
Duration: 2 to 4 weeks, occasionally longer if plans need revision.
Before anything comes down, dust containment and floor protection go up first (more on that below). Demolition on a basement job is usually limited: an old drop ceiling, old flooring, a section of damaged drywall near a past water issue.
Duration: 1 to 3 days.
Framing, electrical and plumbing rough-in, insulation, drywall, then trim, flooring, and fixtures. Inspections happen at set points through this stage, not just at the end.
Duration: 6 to 10 weeks depending on scope, longer for a full conversion with a bathroom and bedroom.
Once the build is complete, the final building inspection is scheduled with the town. We walk the space ourselves first and put together a punch list, touch-ups and adjustments, anything not finished to our own standard yet.
Duration: 1 to 2 weeks to close out the punch list after the final inspection passes.
.
We walk the finished space with you, room by room: where shutoffs are, how to care for new flooring, what's covered going forward. Workmanship is covered for one year from this date.
Duration: a single visit, usually 30 to 45 minutes.
Dust containment goes up before demolition starts: sealed plastic sheeting at the top of the basement stairs and a negative air machine to keep dust out of the rest of the house. Ram board or rosin paper protects flooring along the path from your front door to the basement stairs for the length of the job.
Crew arrives between 7:30 and 8:00 AM and wraps by 3:30 to 4:00 PM on a normal day. At the end of each day, the work area is swept, debris bagged, and tools locked up before anyone leaves.
Parking and access get worked out before the first day, not on it. A lot of Belmont’s older neighborhoods have narrow driveways and tight, sometimes permit-only, street parking, so we confirm ahead of time where the crew parks and where a dumpster or trailer sits so you’re never blocked into your own driveway. If a dumpster has to sit on the street instead of your property, that’s a separate town permit we handle, not something you find out about after it shows up.
See what your project actually costs and contact us to get a site visit on the calendar.